News

Pipeline and heating installation training device

Author: Time:2024-02-24 Hits:
Pipeline and heating installation tr--ning device,Robot PLC control tr--ning device

I. Overview
Pipeline and heating installation tr--ning device, pipeline and heating tr--ning room, pipeline and heating engineering technical tr--ning device, pipeline workers install water, dr--nage, sanitary facilities, heating and other pipeline systems for houses and industrial venues. Installation of pipelines such as galvanized steel pipes, PPR hot melting pipes, high -density PE ground heating pipes, PVC dr--nage pipes. During the installation process, various pipe joint thread connections are generally used, special accessories are connected, hot -melt connection, adhesive adhesive connection, and pipeline crimping can also be used for joints. In various types of building components, the installation and fixing of pipelines are an important part of work skills. The installation of terminal accessories such as faucet and corner valves, hygiene facilities and heating equipment are also important, including shower, washbasin, toilet sanitary facilities,, toilet sanitary facilities,, toilet sanitary facilities, and toilet sanitation facilities, and toilet sanitation facilities,, toilet sanitary facilities, and toilet sanitation facilities. The heating bag, radiator, etc. should have the knowledge and skills of pipeline and heating.
Second, pipeline and heating equipment, pipeline and heating tr--ning devices, pipeline and heating tr--ning assessment equipment technical performance:
1. Input voltage: three -phase and four -line (or five -line system) AC380V ± 10% 50Hz 50Hz
2. Working environment: The environmental temperature range is -5 ° C ~+40 ° C relative humidity <85%(25 ° C) altitude <4000m
3. Device capacity: <6kva
4. M--n device Dimensions: 3920X width 2000x height 2000mm
three. Pipeline and heating equipment, pipeline and heating tr--ning devices, pipeline and heating tr--ning assessment equipment m--n functions
1. For pipelines and heating skills according to the requirements, the ability to install, analyze, and m--nt--n fault detection, analysis, and m--ntenance according to professional standards. Understand industry safety standards, be able to choose appropriate materials and consumables, and be proficient in using various equipment. Self -system design, water dr--nage pipe installation, gas pipeline installation, heating pipe road installation, cold water pipe road installation, heat water pipe road installation, solar pipeline installation, etc.:
Module 1: Pipeline and heating system solution design.

Pipeline and heating installation tr*ning device(图1)

Pipeline and heating installation tr--ning device,Robot PLC control tr--ning device

Overview
 
The four -free mechanical hand tr--ning model is the micro -shrinking of the three -dimensional positioning system. Use the programmable controller control. In the three directions of the X, Y, and Z axis, accurately drives the stepping motor to carry out the finished items. Can achieve all the action processes in the modern logistics system. Supporting Mitsubishi FX1N-40MT.
The tr--ning device is composed of aluminum alloy r--l tr--ning tables, robotics devices, and control systems. The tr--ning device is a coordinate robot hand, which can complete the position of the rotation of the robot, the vertical upper and lower up and down, the arm horizontally, and the position of the four freedom rotation of the hand claw. At the same time, the transistor PLC programmable controller is configured to control the entire robotic player. The control part of the tr--ning device is designed with a standard module, which can be divided into power modules, PLC modules, and system control modules. Including a number of technologies such as stepping into motor, mechanical transmission, pneumatic, programmable controllers, etc., providing students with a comprehensive tr--ning environment for students, so that many single professional knowledge that students have learned are on Here is a comprehensive understanding, comprehensive tr--ning and mutual improvement.
 
Technical Parameters
 
Power: single phase AC220V, 50Hz
Power: <200W
Size: not less than 600*400*500mm
 
Equipment structure:
 
The tr--ning device tablet is a metal structure. The I/O terminal of the PLC module of the tr--ning assessment device, the connection terminals of each commonly used module and the PLC, are connected to the security socket and connect the circuit with a wire with a safe plug. The circuit of the photoelectric switch, sensor and indicator element is connected through the terminal row. The combination of the plug -in connection circuit with the terminal connection circuit not only ensures the tr--ning, formation and consolidation of the basic skills of students, but also to ensure the rapid, safe and reliable circuit connection.
 
1. Manual/automatic control mode, for hardware detection and programming.
2. Open execution agencies can be programmed according to different control schemes to form different execution systems, and adapt to PLC learning and programming at different levels of personnel. It can also be used as a subject design or research.
3. The product is open, and the overall mechanical structure is clearly visible.
Recommended information
Recommended Products