News
News
- Excavator steering system anatomy training desk
- Hydraulic front hanging mechanical experimental device
- Water pump performance experimental device
- Contact oxidation pool training desk
- Drinking water treatment process training desk
- Reverse osmosis membrane training
- Softness and salt removal experimental device
- Salvation tank experimental device
- Aerobic biological treatment training device
- Bio -turntable principle experimental device
- Lucky ratio blocking test device
- Socci condiment training desk
- Industrial wastewater treatment training desk
- Industrial wastewater treatment process simulation experimental device
- CNC milling machine installation and maintenance training table
- CNC Machining Center Maintenance and Processing Technical Experimental Desk
- AC Voltage Merragatory System Electrical Experiment Device
- Solar power generation experimental device
- Electrical experimental device of ship anchor machine
- Worker Electrical Engineering Technology Training Device
Contact us
WeChat:18058325687
Phone:18058325687
WhatsApp:18058325687
Address:Shanghai Industrial Park, Jiading District, Shanghai
News
The front bridge and rear bridge assembly disassembly training device
Author:
Time:2024-02-13
Hits:
The front bridge and rear bridge assembly disassembly tr--ning device,Drive angle measurement tr--ning device
1. Function Introduction

The front bridge and rear bridge assembly disassembly tr--ning device,Drive angle measurement tr--ning device
1. Function Introduction
1. Use Volkswagen Jetta front and rear bridge assembly (complete accessories, easy to disassemble), and install it on a mobile table. The installation of the original car is convenient for students to disassemble and assemble from different angles.
2. The tablet uses high -intensity steel structure welding, and the surface is sprayed on the surface. There is a self -locking foot wheel at the bottom, which can be moved for easy teaching.
two. Technical specification
Equipment shape: 100 × 500 × 1100mm (long × width × height)
Color: 7032
Steel pipe: 40*40*3mm
Universal foot wheel
The first two universal band lock function foot wheels
2 After the two thousand -facing foot wheels
The foot wheel and the table frame are fixed with the M6*4 screws, which is convenient for equipment m--ntenance and m--ntenance.
Foot wheel: 60mm × 50mm (diameter × width)
Foot wheel support: 1.0T

The front bridge and rear bridge assembly disassembly tr--ning device,Drive angle measurement tr--ning device
The m--n parameters
Material: 45#Steel measurement range: (1) front angle, (2) rear angle, (3) quantity inclination angle, (4) m--n (deputy) partial angle
Specification size: long 250X width 250x height 250mm
One and function
1. Front angle measurement
2. Rear angle measurement
3. Measurement of quantitative inclination angle
4. Master (deputy) partial angle measurement
5. Measurement accuracy ± 1 ° scale disk calibration accuracy ± 1 °
2. Configure six knives:
1. Silk knife (thread car knife),
2. Digging a knife (digging inner holes),
3. 45 ° car knife (car circle, flat -end surface, chamflow),
4. 90 ° car knife (st--nless car knife, car round, flat -end surface),
5, 75 ° car knife (st--nless car knife, car circle, flat -end surface),
6. Cut the knife (cut off, cut tank)
3. M--n technical parameters:
1. Production materials: Made with 45 ′ steel.
2. Standard specifications: 250 × 250 × 250mm.
- Previous:Large and small trucks, anatomy training device
- Next:Betal method test heating coefficient experimental desk
Recommended information
Recommended Products