News
News
- Excavator steering system anatomy training desk
- Hydraulic front hanging mechanical experimental device
- Water pump performance experimental device
- Contact oxidation pool training desk
- Drinking water treatment process training desk
- Reverse osmosis membrane training
- Softness and salt removal experimental device
- Salvation tank experimental device
- Aerobic biological treatment training device
- Bio -turntable principle experimental device
- Lucky ratio blocking test device
- Socci condiment training desk
- Industrial wastewater treatment training desk
- Industrial wastewater treatment process simulation experimental device
- CNC milling machine installation and maintenance training table
- CNC Machining Center Maintenance and Processing Technical Experimental Desk
- AC Voltage Merragatory System Electrical Experiment Device
- Solar power generation experimental device
- Electrical experimental device of ship anchor machine
- Worker Electrical Engineering Technology Training Device
Contact us
WeChat:18058325687
Phone:18058325687
WhatsApp:18058325687
Address:Shanghai Industrial Park, Jiading District, Shanghai
News
Basic parts surveying and mapping experimental device
Author:
Time:2024-02-01
Hits:
Basic parts surveying and mapping experimental device,The front bridge and rear bridge assembly disassembly tr--ning device
Function:

Basic parts surveying and mapping experimental device,The front bridge and rear bridge assembly disassembly tr--ning device
Function:
1. Institutional assembly tr--ning;
2. Measurement and tr--ning of institutional parts;
3. Drawing tr--ning tr--ning for institutions;
4. Drawing tr--ning for institutional parts;
Product parameters
1. Product material: aluminum alloy refined, use CNC machine tool refinement and produced through anode oxidation technology (do not accept rotation of rondrobin), each part must be installed in the aluminum alloy surveying box, and the buffer embedded material block;
2. In order to facilitate the safe surveying and mapping box size: about 365 × 265 × 120mm
3. Det--led configuration:
Standard components to surveillance and mapping screws and bolts, size tolerances and limit shafts, sets of the axis, the size of the hole tolerance and limit, and the two -dimensional engineering diagram of accuracy brackets and end covers, and the error recognition theory.
Occupational skills comprehensive integration tr--ning virtual simulation system:
The software in the software can be rotated, magnified, reduced, and translated at 360 °. There are general interactive buttons: return, homepage, help. All virtual simulation tasks are prompted, and the software automatically hooks after a task. There is an experimental task above the tool library
1. Basic three -dimensional (XYZ space coordinate icon is automatically rotated at the XYZ space coordinate icon.)
A. Graphic stereo: The experimental steps are divided into experimental tasks (text prompt tasks) -the construction model (the model in the drag and dragging tool library to the three -projection surface system, and automatically appear the projection, there is a prompt when choosing an error) - change the attitude (by passing the passage) Click on the up, down, left and right arrows) — Select the projection (enter the answer interface, select the 3D projection map completed at this time in 6 items)
B. Cutting three -dimensional: The experimental steps are divided into experimental tasks (text prompt tasks) -the construction model (the model in the drag and drag the tool library to the three -projection surface system, and automatically display projection) -The label projection situation (for the three -dimensional projection drawing calibration , Select the corresponding labeling symbols in 14 blank fences)
C. Concerning three -dimensional: Experimental steps are divided into experimental tasks (text prompt tasks) -Dhole digging (select arbitrarily digging models, at this time, you can select any noodles in the XYZ space coordinate, the model can be switched at the same time, and a coordinate slider appears appears. According to the size of the slider, the model appears with a corresponding degree of cutting surface) -the pore diameter change (select 1-4 aperture)-rear pores-select projection (enter the answering interface, select the three-dimensional projection map completed at this time in 8 items)

Basic parts surveying and mapping experimental device,The front bridge and rear bridge assembly disassembly tr--ning device
1. Function Introduction
1. Use Volkswagen Jetta front and rear bridge assembly (complete accessories, easy to disassemble), and install it on a mobile table. The installation of the original car is convenient for students to disassemble and assemble from different angles.
2. The tablet uses high -intensity steel structure welding, and the surface is sprayed on the surface. There is a self -locking foot wheel at the bottom, which can be moved for easy teaching.
two. Technical specification
Equipment shape: 100 × 500 × 1100mm (long × width × height)
Color: 7032
Steel pipe: 40*40*3mm
Universal foot wheel
The first two universal band lock function foot wheels
2 After the two thousand -facing foot wheels
The foot wheel and the table frame are fixed with the M6*4 screws, which is convenient for equipment m--ntenance and m--ntenance.
Foot wheel: 60mm × 50mm (diameter × width)
Foot wheel support: 1.0T
Recommended information
Recommended Products