News
News
- Excavator steering system anatomy training desk
- Hydraulic front hanging mechanical experimental device
- Water pump performance experimental device
- Contact oxidation pool training desk
- Drinking water treatment process training desk
- Reverse osmosis membrane training
- Softness and salt removal experimental device
- Salvation tank experimental device
- Aerobic biological treatment training device
- Bio -turntable principle experimental device
- Lucky ratio blocking test device
- Socci condiment training desk
- Industrial wastewater treatment training desk
- Industrial wastewater treatment process simulation experimental device
- CNC milling machine installation and maintenance training table
- CNC Machining Center Maintenance and Processing Technical Experimental Desk
- AC Voltage Merragatory System Electrical Experiment Device
- Solar power generation experimental device
- Electrical experimental device of ship anchor machine
- Worker Electrical Engineering Technology Training Device
Contact us
WeChat:18058325687
Phone:18058325687
WhatsApp:18058325687
Address:Shanghai Industrial Park, Jiading District, Shanghai
News
Process Control Equipment Fault Diagnosis and Maintenance Skills Training Platform
Author:
Time:2023-12-20
Hits:
Process Control Equipment Fault Diagnosis and M--ntenance Skills Tr--ning Platform,Mine power supply system simulation experimental device
1. Product overview

Process Control Equipment Fault Diagnosis and M--ntenance Skills Tr--ning Platform,Mine power supply system simulation experimental device
1. Product overview
With the rapid development of science and technology, the degree of automation of process control equipment is getting higher and higher, the function of process control equipment is increasing, and the operation has become more and more complicated. Many smart instrument devices are gradually being widely used. Therefore The skills of equipment m--ntenance and equipment personnel should also be continuously updated. This improves the theoretical and technical level and actual operating skills of technical workers, and enhances the competitiveness of workers under the conditions of new forms. This set of equipment can improve the ability of equipment m--ntenance, m--ntenance and operators to handle problems on the spot.
Second, systemic characteristics
1. The object system is a st--nless steel frame, and all devices are designed by st--nless steel and aluminum alloy
2. The secondary measuring instrument of the sensor is installed on the object, which is convenient for students to perform various operations at the scene
3. The control part uses the st--nless steel mesh board. The on -site signal is directly received by the wiring terminal to the measuring instrument, which enhances the students' hands -on skills. At the same time, the wiring of the on -site instrument is more intuitive.
4. The object system is beautiful and open, and it provides a good tr--ning object for students.
3. Technical performance
1. Input voltage: single -phase three -line ~ 220V ± 10% 50Hz 50Hz
2. Working environment: The environmental temperature range is -5 ° C ~+40 ° C relative humidity <85%(25 ° C) altitude <4000m
3. Overall size: 160cm × 75cm × 154cm
4. Device capacity: <3kva

Process Control Equipment Fault Diagnosis and M--ntenance Skills Tr--ning Platform,Mine power supply system simulation experimental device
I. Overview
The "Mine Power Supply System Simulation Operation Device" is designed according to the typical mining power supply system, including the power supply part of the well, the part of the bottom of the underground, the power supply part of the recovery area, and the power supply part of the mobile substation. Through the tr--ning of this device, students can have a comprehensive understanding of the mining power supply system, can complete the pouring operation of the power supply system, and set up an accidental operation alarm. It can be used as a safety tr--ning and assessment of the mining electricity personnel.
2. Technical parameters
1. Input power supply: three -phase and five lines ~ 380V ± 10% 50Hz 50Hz
2. Working environment: environmental temperature -5 ℃ ~ + 40 ℃, relative humidity <85%(25 ℃), altitude <4000m
3. Dimensions: 2400mm × 500mm × 2000mm
3. Device configuration
1. Device structure
The device adopts a cabinet structure, the cabinet adopts a double -layer sub -light dense -densely spraying structure, the panel uses a 2mm thick aluminum plate, and the text symbols on the panel are sprayed. The cabinet is equipped with six universal wheels for easy movement and fixation.
2. Power supply system
The front of the control screen is a typical mine power supply system simulation operation screen. The device uses dual power supply. The system is divided into five parts:
(1) The ground 35kV power supply part (dual power supply)
(2) 6KV power supply parts on the ground (sideline improved machine, m--n promotioner, ventilation, --r compressor, etc.)
(3) 6KV power supply part of the central transformer center (r--sing machine, rectification equipment, water pump, low -voltage power lighting, etc.)
(4) Part of the substation in the area (coal and electric drill)
(5) Power distribution part of the mobile substation of the mobile phone (coal mining machine)
The m--n switching elements in the system are switches and circuit breakers. The corresponding system diagrams on each switch operation element and circuit breaker components on the corresponding system diagram are embedded in the corresponding position of the system diagram. brake. Each power supply has a corresponding load and instruction
Recommended information
Recommended Products