- Excavator steering system anatomy training desk
- Hydraulic front hanging mechanical experimental device
- Water pump performance experimental device
- Contact oxidation pool training desk
- Drinking water treatment process training desk
- Reverse osmosis membrane training
- Softness and salt removal experimental device
- Salvation tank experimental device
- Aerobic biological treatment training device
- Bio -turntable principle experimental device
- Lucky ratio blocking test device
- Socci condiment training desk
- Industrial wastewater treatment training desk
- Industrial wastewater treatment process simulation experimental device
- CNC milling machine installation and maintenance training table
- CNC Machining Center Maintenance and Processing Technical Experimental Desk
- AC Voltage Merragatory System Electrical Experiment Device
- Solar power generation experimental device
- Electrical experimental device of ship anchor machine
- Worker Electrical Engineering Technology Training Device
WeChat:18058325687
Phone:18058325687
WhatsApp:18058325687
Address:Shanghai Industrial Park, Jiading District, Shanghai
ZOPLYT-38 Fire fighting skills training dedicated simulation elevator training device
The simulation elevator model specially used for fire fighting skills training, the fire fighting simulation elevator, and the elevator teaching model include guide rails, counterweight mechanism, car, floor call indicator controller, traction rope, guide wheel, first floor leveling sensor, and upper (lower) limit switch.
The complete set of transparent simulation teaching elevators is equipped with:
1. M*n elevator model - including Mitsubishi FX3U-48MR programmable controller (PLC);
2. Special communication cable for PLC peripherals;
3. Mitsubishi programmer operation manual;
4. Mitsubishi PLC special programming tool software;
5. Teaching the elevator manual.
The basic structure of the elevator:
1. Machine room part: The reduction motor realizes the up and down movement of the elevator.
2. Hoistway part: including guide r*ls, counterweight mechanism , car, floor call indicator controller, traction rope, guide wheel, first floor leveling sensor, upper (lower) limit switch, upper (lower) limit switch, accompanying cable, car controller, buffer, etc.
3. Electrical control part: power *r switch (leakage release), DC24V drive power supply, PLC programmable controller, wiring port circuit board.
The elevator car position detection and electrical floor selection signals are obt*ned by the bistable magnetic switches installed on the top of the car and at each floor station, thus getting rid of the complex circuit system controlled by relays and contact switches and other contact devices in the past, optimizing the circuit, greatly improving the reliability of system operation, and facilitating m*ntenance.
A. Spring buffer device for car and counterweight
The buffer is a safety device at the elevator's extreme position. When the elevator f*ls and causes the car or counterweight to hit the bottom or top, the car or counterweight hits the spring buffer, which absorbs the energy of the elevator, thereby safely slowing the car or counterweight down until it stops.
B. Terminal limit switch safety protection system
Terminal limit switches are installed at the top and bottom of the elevator shaft. When the elevator loses control due to a malfunction and the car hits the top or bottom, the terminal limit switch cuts off the control circuit and stops the car.
C. Fire emergency landing and fire linkage action channel
D. Virtual simulation software for installation and m*ntenance of elevators and escalators: The software adopts the form of three-dimensional simulation to cultivate students' hands-on ability. The software is designed based on C# and JS language programming. The models in the software are all 3D models made by 3Dmax and rendered and polished to make the models look the same as real parts. There are tool libraries, component libraries, and labor protection supplies libraries. Internal tools are optional, and the default positions and abandoned steps can be restored. The following three-dimensional experiments can be carried out: m*ntenance device installation position operation, m*ntenance speed answering, m*ntenance operation, safety clamp installation, measuring the gap between the safety clamp and the guide r*l working surface, gap adjustment operation, escalator step installation, step auxiliary wheel installation, step tightening operation, step installation inspection, selection of sill groove center line, and assembly of other sill components.
The m*n technical parameters:
Dimensions: Length * Width * Height = 700 * 700 * 1800 |
Power: 50W Voltage: 24V |
Configuration table:
Serial number |
name |
unit |
quantity |
1. |
Elevator frame |
set |
1 |
2. |
Programmable Controllers |
set |
1 |
3. |
Computer room |
set |
1 |
4. |
Hoistway |
set |
1 |
5. |
Hall door part |
set |
1 |
6. |
Car part |
set |
1 |
7. |
Spring buffer device for car and counterweight |
set |
1 |
8. |
Door machine torque safety protection device |
set |
1 |
9. |
Automatic closing device for landing door |
set |
1 |
10. |
Terminal limit switch safety protection system |
set |
1 |
11. |
Gear motor |
tower |
1 |
12. |
Traveling cable |
strip |
1 |
13. |
Floor Summoning Box |
piece |
4 |
14. |
Control box in car |
piece |
1 |
15. |
Floor display |
indivual |
4 |
16. |
Electrical control panel |
piece |
1 |
17. |
Alarm buzzer |
Only |
1 |
18. |
Wiring board |
piece |
1 |
19. |
Limit switch (up, down) |
Only |
4 |
20. |
Teaching Elevator Instructions |
book |
1 |
twenty one. |
Software, etc. |
set |
1 |
twenty two. |
Fire call system |
set |
1 |
twenty three. |
Fire linkage action channel |
set |
1 |
- Previous:ZOPLR-13 central air conditioning assessment and training device
- Next:ZOPDT-102C physical elevator installation, disassembly and debugging training device