- Excavator steering system anatomy training desk
- Hydraulic front hanging mechanical experimental device
- Water pump performance experimental device
- Contact oxidation pool training desk
- Drinking water treatment process training desk
- Reverse osmosis membrane training
- Softness and salt removal experimental device
- Salvation tank experimental device
- Aerobic biological treatment training device
- Bio -turntable principle experimental device
- Lucky ratio blocking test device
- Socci condiment training desk
- Industrial wastewater treatment training desk
- Industrial wastewater treatment process simulation experimental device
- CNC milling machine installation and maintenance training table
- CNC Machining Center Maintenance and Processing Technical Experimental Desk
- AC Voltage Merragatory System Electrical Experiment Device
- Solar power generation experimental device
- Electrical experimental device of ship anchor machine
- Worker Electrical Engineering Technology Training Device
WeChat:18058325687
Phone:18058325687
WhatsApp:18058325687
Address:Shanghai Industrial Park, Jiading District, Shanghai
ZOPTDT-183B Electric Power Drag training device
Power dragging training table, electrical dragging skills training assessment device all components are led to the wiring terminal through the wire. Students only need to be wirled on the terminal when the student wiring, which is conducive to protecting components. Close to the industrial scene.
1. Features:
1. The electrical control circuits are all installed on the hanging box, which is easy to operate and replace. It can expand functions or develop new tr*ning projects.
2. The operation console only needs three-phase four-wire AC power supply to be put into use. It occupies a small area, saves space and reduces infrastructure investment.
3. Equipped with voltage type leakage protector and current type leakage protector to ensure operator safety. Each power output has a soft cut-off protection function.
4. The control panel is also equipped with a timer and alarm recorder, which provides a unified standard for the assessment of students' practical tr*ning skills.
5. All components are led to the terminal blocks through wires. Students only need to wire on the terminals when wiring, which is conducive to protecting the components and routing the wires through the wire trough to be close to the industrial site.
2. Technical performance:
1. Working power supply: three-phase four-wire (or three-phase five-wire) ~ 380V ±5% 50Hz
2. Temperature: -5℃~+40℃, relative humidity <85% (25℃)
3. Device capacity: <1.0KVA
4. Overall dimensions: 1100×700×1400 (mm)
3. Equipment and equipment
(1) Power control screen
The control panel is made of iron with a double-layer matt dense pattern spray-plastic structure and an aluminum panel. It provides power and protection for practical tr*ning and assessment.
1. Three-phase four-wire power input, through the leakage protector, turn on the m*n switch, and the contactor operates through the start and stop buttons.
2. There are three 450V pointer AC voltmeters to indicate the three-phase power supply voltage at input; three indicator lights to indicate the connection between the tr*ning device and the external power supply.
3. Three-phase four-wire power output, with the function of overload or short-circuit of the single-chip microcomputer full-process monitoring device. Overload or short-circuit soft cut-off and alarm, the power supply can be started only after troubleshooting and reset.
4. Equipped with a timer and alarm recorder, which can be used as a clock at ordinary times. It has functions such as setting the tr*ning and assessment time, timing alarms, and cutting off the power supply. In addition, it can automatically record the total number of leakage alarms and short-circuit alarms caused by wiring or operation errors, providing a unified standard for the assessment of students' practical tr*ning skills.
(2) Tr*ning table: The table body is made of aluminum wood, and the tabletop is made of fireproof, waterproof, wear-resistant high-density board, with drawers and storage cabinets.
(3) Practical tr*ning components
1. DW-71 electric drag tr*ning component (1)
2. DW-72 electric drag tr*ning component (2)
3. DW-73 electric drag tr*ning component (3)
4. Three-phase asynchronous motor 380V Y/△ connection method, three-phase asynchronous motor: voltage 380V, current 0.4A, frequency 50Hz, power about 180W, with 2 centrifugal switches
4. Practical tr*ning projects
1. Knife switch forward control circuit
2. Contactor inching forward control circuit
3. Forward rotation control circuit with self-locking
4. Forward rotation control circuit with over-finding protection
5. The reverse switch controls the forward and reverse control circuit
6. Contactor interlocking forward and reverse control circuit
7. Button interlocking forward and reverse control circuit
8. Button contactor composite interlock control circuit
9. Automatic round trip control circuit
10. Contactor controlled series resistor step-down starting circuit
11. Time relay controls series resistor voltage reduction control circuit
12. Manual Y/△ reduced voltage starting
13. Contactor controls Y/△ voltage reduction starting
14. Time relay controls Y/△ step-down starting
15. QX3-13 type Y/△ automatic starting control circuit
16. Half-wave rectification energy consumption braking control circuit
17. Full-wave rectification energy consumption braking control circuit
18. C620 lathe electrical control circuit
19. Manual voltage reduction starting
20. Single-phase operation reverse braking control circuit
21. Electric hoist electrical control circuit
22. C6163 lathe electrical control circuit
23. Control circuit interlocking control circuit
24. M*n circuit interlocking control circuit
- Previous:ZOPJC-PX machine tool circuit maintenance training device
- Next:ZOPJC-QZ bridge crane electrical training device