- Excavator steering system anatomy training desk
- Hydraulic front hanging mechanical experimental device
- Water pump performance experimental device
- Contact oxidation pool training desk
- Drinking water treatment process training desk
- Reverse osmosis membrane training
- Softness and salt removal experimental device
- Salvation tank experimental device
- Aerobic biological treatment training device
- Bio -turntable principle experimental device
- Lucky ratio blocking test device
- Socci condiment training desk
- Industrial wastewater treatment training desk
- Industrial wastewater treatment process simulation experimental device
- CNC milling machine installation and maintenance training table
- CNC Machining Center Maintenance and Processing Technical Experimental Desk
- AC Voltage Merragatory System Electrical Experiment Device
- Solar power generation experimental device
- Electrical experimental device of ship anchor machine
- Worker Electrical Engineering Technology Training Device
WeChat:18058325687
Phone:18058325687
WhatsApp:18058325687
Address:Shanghai Industrial Park, Jiading District, Shanghai
Zoppd-DZ 35KV substation and 10kV power distribution system pouring operation training device
The transformation station and the 10KV power distribution system pour the operation screen. The power distribution pour contains three voltage levels of 35kV, 10KV and 0.4KV: 35KV has 4 routes, and the double mother belt contacts; Two outs, the ring network is powered; the 0.4kV side uses a single mother segment.
As the number of large and medium-sized enterprises in our country increases year by year, the power industry develops rapidly, the power grid becomes increasingly complex and diverse, and the connections between the same voltage level and different voltage levels are also very close. In this case, correct switching is particularly important.
"35kV substation and 10kV power supply and distribution system switching operation screen" is a tr*ning device specially developed for switching operations in substations. This system cont*ns three voltage levels: 35kV, 10kV and 0.4kV: 35kV has 4 incoming lines and double busbars; the 10kV side uses a single bus segment, two inputs and two outputs, and ring network power supply; the 0.4kV side uses a single busbar section and has a backup power generation system. On this typical 35kV substation model , students can perform switching operations under various working conditions. The voltage level and wiring method of the substation can also be designed according to user requirements. Therefore, this device is suitable for tr*ning and assessment by various vocational schools, power supply and distribution institutions, power companies, vocational skills tr*ning departments and other institutions.
2. Characteristics
1. Authenticity: The layout of device components and switch operations all refer to actual engineering practices to create a real environment for various professional positions.
2. Modular design: The device uses a single-chip microcomputer or PLC as the core, and the switch combination module is designed as a unit, with strong scalability.
3. Imageability: The device is equipped with a sound and light system, which can effectively improve the effectiveness of tr*ning and assessment.
4. Combination of software and hardware: The device is equipped with background software, and customers can choose to purchase it to realize telemetry and remote control.
3. Technical indicators
1. Input power: single-phase three-wire ~ 220V±10% 50HZ
2. Working environment: temperature -10℃~+50℃
3. Device capacity: <1.5kVA
4. Overall dimensions: 4000mm×2200mm×500mm
4. Practical tr*ning projects
1. System operation mode switching and switching operation
2. Line power outage switching operation
3. Line power supply and switching operation
4. The outlet switch changes from running state to m*ntenance switching operation.
5. The outlet line changes from m*ntenance status to cold standby switching operation.
6. Outgoing line switching operation from cold standby to hot standby
7. The outlet line switches from hot standby to running switching operation.
8. Outgoing line switching operation from m*ntenance to operation
9. Switching operation from two incoming lines to one line power supply
10. Switching operation from one incoming line power supply to two lines of power supply
11. The 35kV busbar changes from running state to m*ntenance switching operation.
12. The 35kV busbar changes from m*ntenance status to running operation.
13. The 35kV transformer switches from running state to m*ntenance operation.
14. The 35kV transformer switches from m*ntenance status to operation and switching operation.
15. 10kV bus changes from running state to m*ntenance switching operation
16. 10kV bus changes from m*ntenance status to running switching operation
17. The 10kV transformer switches from running state to m*ntenance operation.
18. The 10kV transformer switches from m*ntenance status to operation and switching operation.
Hot-selling product: Electrician tr*ning bench
- Previous:Zoppd-DY low-voltage power distribution system training device
- Next:ZOPPD-10K high and low voltage power supply and distribution system training device